Projects
BAE Systems
Integration of 360 Ton Air-Cooled Chillers, chilled water pumping systems, and installation of advanced valves and controls.
Harbor Hostpital
Integration of 1300 Ton New Chiller Capacity, chilled & condenser water pumping, and variable frequency drives.
Franklin Square Hospital
Installation of 400 ton centrifugal chiller, integration of chilled water pumps, and custom air handling units.